News

Show the internal strength, understand the latest trends of the industry, to provide quality and thoughtful service for customers.


News
Postion:Home > News
Application of LNG shipping industry announced the second batch of pilot demonstration project list
更新时间:2016-11-22 作者:admin 来源:China ship news
   
  Released recently, the ministry of transport of water transport industry application of liquefied natural gas (LNG) the second batch of pilot demonstration project list, there are including hunan environmental passenger ship pilot application of LNG project, high familiar the reservoir water level drop shore-based type Marine LNG charging dock project, nine projects in the column.Time limit for the project in 2016 ~ 2018.
  Hunan environmental passenger ship pilot application of LNG project will be a new LNG fuel power 1 passenger ship, 1 in the form a complete set of environmental construction of the shore-based type LNG filling station.
  Replaced the reservoir water level high shore-based type Marine LNG filling dock project will fall in chongqing banan hemp willow mouth town 1 座船 with new type filling shore-based LNG terminal, new 1 200 m3 LNG mobile charging ship, building or using dynamic system overall update rebuilding LNG fuel power ship 10 (including the ro-ro ship, engineering, etc.).
  Shanghai inland water main ship type application of LNG project operating LNG fuel ship will be built in 200, in Shanghai inland waterway construction 3 ~ 4 LNG filling station.